CDCLVD1213EVM

Mfr. #: CDCLVD1213EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL MODULE FOR CDCLVD1213
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: CDCLVD1213EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCLVD1213EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Clock Buffers Bulk is the packaging method for this product This product's 800 MHz range is 0Hz to 2.2GHz. The Timing, Clock Buffer is the Main-Purpose. Primary-Attributes: - IC package type: CDCLVD1213 Maximum operating temperature of + 85 C Minimum operating temperature: - 40 C This product operates at a 2.5 V supply voltage for reliable performance. This tool is designed for the CDCLVD1213.

CDCLVD1213EVM Image

CDCLVD1213EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCLVD1213EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Clock Buffers
  • Packaging Bulk
  • Frequency 800 MHz
  • Main-Purpose Timing, Clock Buffer
  • Primary-Attributes -
  • Embedded No
  • Utilized-IC-Part CDCLVD1213
  • Maximum-Operating-Temperature + 85 C
  • Minimum-Operating-Temperature - 40 C
  • Operating-Supply-Voltage 2.5 V
  • Tool-Is-For-Evaluation-Of CDCLVD1213

CDCLVD1213EVM

CDCLVD1213EVM Specifications

CDCLVD1213EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Clock Buffers

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 800 MHz.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Timing, Clock Buffer.

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is -.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is CDCLVD1213.

  • A: At what frequency does the Maximum-Operating-Temperature?

    Q: The product Maximum-Operating-Temperature is + 85 C.

  • A: What is the Minimum-Operating-Temperature of the product?

    Q: The Minimum-Operating-Temperature of the product is - 40 C.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 2.5 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed CDCLVD1213

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
172,52 $
172,52 $
10
163,89 $
1 638,89 $
100
155,26 $
15 526,35 $
500
146,64 $
73 318,90 $
1000
138,01 $
138 012,00 $
Top