CDCLVC1104EVM

Mfr. #: CDCLVC1104EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL MODULE FOR CDCLVC1104
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: CDCLVC1104EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCLVC1104EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Clock Buffers This product's 180 MHz 250 MHz range is 0Hz to 2.2GHz. The Timing, Clock Buffer is the Main-Purpose. Primary-Attributes: - IC package type: CDCLVC1104 This product operates at a 2.5 V 3.3 V supply voltage for reliable performance. This tool is designed for the CDCLVC1104. SMA interface type

CDCLVC1104EVM Image

CDCLVC1104EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCLVC1104EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Clock Buffers
  • Frequency 180 MHz 250 MHz
  • Main-Purpose Timing, Clock Buffer
  • Primary-Attributes -
  • Embedded No
  • Utilized-IC-Part CDCLVC1104
  • Operating-Supply-Voltage 2.5 V 3.3 V
  • Tool-Is-For-Evaluation-Of CDCLVC1104
  • Interface-Type SMA

CDCLVC1104EVM

CDCLVC1104EVM Specifications

CDCLVC1104EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Clock Buffers.

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 180 MHz 250 MHz.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Timing, Clock Buffer.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is CDCLVC1104.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 2.5 V 3.3 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is CDCLVC1104.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
223,50 $
223,50 $
10
212,32 $
2 123,25 $
100
201,15 $
20 115,00 $
500
189,98 $
94 987,50 $
1000
178,80 $
178 800,00 $
Top