CDCE949PERF-EVM

Mfr. #: CDCE949PERF-EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL MOD PERFORMANCE FOR CDCE949
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: CDCE949PERF-EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCE949PERF-EVM Overview

Product belongs to the CDCE949 series. This product is categorized as Evaluation Boards Type: PLL Synthesizers / Multipliers / Dividers Bulk is the packaging method for this product This product's 230 MHz range is 0Hz to 2.2GHz. The Timing, Clock Generator is the Main-Purpose. Primary-Attributes: - IC package type: CDCE949PERF This product operates at a 1.8 V supply voltage for reliable performance. This tool is designed for the CDCE949. 2 mA is 92 nA. Serial interface type

CDCE949PERF-EVM Image

CDCE949PERF-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCE949PERF-EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series CDCE949
  • Product Evaluation Boards
  • Type PLL Synthesizers / Multipliers / Dividers
  • Packaging Bulk
  • Frequency 230 MHz
  • Main-Purpose Timing, Clock Generator
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part CDCE949PERF
  • Operating-Supply-Voltage 1.8 V
  • Tool-Is-For-Evaluation-Of CDCE949
  • Operating-Supply-Current 2 mA
  • Interface-Type Serial

CDCE949PERF-EVM

CDCE949PERF-EVM Specifications

CDCE949PERF-EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is CDCE949.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is PLL Synthesizers / Multipliers / Dividers.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 230 MHz.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Timing, Clock Generator

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is -.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is CDCE949PERF.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 1.8 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is CDCE949.

  • A: At what frequency does the Operating-Supply-Current?

    Q: The product Operating-Supply-Current is 2 mA.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is Serial.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
223,50 $
223,50 $
10
212,32 $
2 123,25 $
100
201,15 $
20 115,00 $
500
189,98 $
94 987,50 $
1000
178,80 $
178 800,00 $
Top