BQ24074EVM Overview

Product belongs to the bqTINY III series. This product is categorized as Evaluation Boards Type: Battery Management The Power Management, Battery Charger is the Main-Purpose. Primary-Attributes: 1 Cell- Li-Ion/ Li-Pol, 1.5A, 4.75 ~ 6.5V Input IC package type: BQ24074 This tool is designed for the BQ24074. Our product measures 44.8 mm x 45.7 mm in dimensions for compact and convenient use. Input Voltage Range: 5 V

BQ24074EVM Image

BQ24074EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ24074EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series bqTINY III
  • Product Evaluation Boards
  • Type Battery Management
  • Main-Purpose Power Management, Battery Charger
  • Primary-Attributes 1 Cell- Li-Ion/ Li-Pol, 1.5A, 4.75 ~ 6.5V Input
  • Embedded No
  • Utilized-IC-Part BQ24074
  • Tool-Is-For-Evaluation-Of BQ24074
  • Dimensions 44.8 mm x 45.7 mm
  • Input-Voltage 5 V

BQ24074EVM

BQ24074EVM Specifications

BQ24074EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed bqTINY III

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Battery Management.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Power Management, Battery Charger.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed 1 Cell- Li-Ion/ Li-Pol, 1.5A, 4.75 ~ 6.5V Input

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is BQ24074.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is BQ24074.

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 44.8 mm x 45.7 mm.

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 5 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
56,74 $
56,74 $
10
53,91 $
539,08 $
100
51,07 $
5 107,05 $
500
48,23 $
24 116,65 $
1000
45,40 $
45 396,00 $
Top