AFE5809EVM

Mfr. #: AFE5809EVM
Өндіруші: Texas Instruments
Сипаттама: MODULE EVAL FOR AFE5809
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: AFE5809EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AFE5809EVM Overview

Product belongs to the - series. The Interface, Analog Front End (AFE) is the Main-Purpose. Primary-Attributes: 8 Channel LVDS Outputs IC package type: AFE5809

AFE5809EVM Image

AFE5809EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AFE5809EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Main-Purpose Interface, Analog Front End (AFE)
  • Primary-Attributes 8 Channel LVDS Outputs
  • Embedded No
  • Utilized-IC-Part AFE5809

AFE5809EVM

AFE5809EVM Specifications

AFE5809EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Interface, Analog Front End (AFE).

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is 8 Channel LVDS Outputs.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is AFE5809.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
448,50 $
448,50 $
10
426,08 $
4 260,75 $
100
403,65 $
40 365,00 $
500
381,22 $
190 612,50 $
1000
358,80 $
358 800,00 $
Top