AFE5805EVM

Mfr. #: AFE5805EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL MODULE FOR AFE5805
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: AFE5805EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AFE5805EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Ultrasound AFE This product is designed TSW1250EVM ADSDeSer-50EVM amplifier. The Interface, Analog Front End (AFE) is the Main-Purpose. Primary-Attributes: 8 Channel LVDS Outputs IC package type: AFE5805 This product operates at a 5 V supply voltage for reliable performance. This product is an AFE5805EVM is an evaluation tool designed for the ultrasound analog front-end. This tool is designed for the AFE5805. RS-232 USB interface type

AFE5805EVM Image

AFE5805EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AFE5805EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Ultrasound AFE
  • For-Use-With TSW1250EVM ADSDeSer-50EVM
  • Main-Purpose Interface, Analog Front End (AFE)
  • Primary-Attributes 8 Channel LVDS Outputs
  • Embedded No
  • Utilized-IC-Part AFE5805
  • Operating-Supply-Voltage 5 V
  • Description-Function AFE5805EVM is an evaluation tool designed for the ultrasound analog front-end
  • Tool-Is-For-Evaluation-Of AFE5805
  • Interface-Type RS-232 USB

AFE5805EVM

AFE5805EVM Specifications

AFE5805EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Ultrasound AFE.

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed TSW1250EVM ADSDeSer-50EVM

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Interface, Analog Front End (AFE)

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed 8 Channel LVDS Outputs

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed AFE5805

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 5 V.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed AFE5805EVM is an evaluation tool designed for the ultrasound analog front-end

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is AFE5805.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is RS-232 USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
298,50 $
298,50 $
10
283,58 $
2 835,75 $
100
268,65 $
26 865,00 $
500
253,72 $
126 862,50 $
1000
238,80 $
238 800,00 $
Top