AFE4404EVM

Mfr. #: AFE4404EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL MODULE AFE4404
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: AFE4404EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AFE4404EVM Overview

Product belongs to the - series. The Interface, Analog Front End (AFE) is the Main-Purpose. Primary-Attributes: Medical Pulse Oximeter Applications IC package type: AFE4404

AFE4404EVM Image

AFE4404EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AFE4404EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Main-Purpose Interface, Analog Front End (AFE)
  • Primary-Attributes Medical Pulse Oximeter Applications
  • Embedded -
  • Utilized-IC-Part AFE4404

AFE4404EVM

AFE4404EVM Specifications

AFE4404EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Interface, Analog Front End (AFE).

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is Medical Pulse Oximeter Applications.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is AFE4404.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
298,50 $
298,50 $
10
283,58 $
2 835,75 $
100
268,65 $
26 865,00 $
500
253,72 $
126 862,50 $
1000
238,80 $
238 800,00 $
Top