ADS8317EVM

Mfr. #: ADS8317EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL MODULE FOR ADS8317
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: ADS8317EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8317EVM Overview

Product belongs to the microPOWER series. This product's 250k. Data-Interface: SPI 16 bits 1 units Input range: 0 ~ 5 V Included item: Board. IC package type: ADS8317

ADS8317EVM Image

ADS8317EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8317EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series microPOWER
  • Sampling-Rate-Per-Second 250k
  • Data-Interface SPI
  • Number-of-Bits 16
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ 5 V
  • Supplied-Contents Board
  • Utilized-IC-Part ADS8317
  • Power-Typ-Conditions -

ADS8317EVM

ADS8317EVM Specifications

ADS8317EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed microPOWER

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 250k

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is SPI.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 16.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 1

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 0 ~ 5 V.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS8317

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
96,70 $
96,70 $
10
91,87 $
918,70 $
100
87,03 $
8 703,45 $
500
82,20 $
41 099,65 $
1000
77,36 $
77 364,00 $
Top