ADS7888EVM

Mfr. #: ADS7888EVM
Өндіруші: Texas Instruments
Сипаттама: EVALUATION MODULE FOR ADS7888
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: ADS7888EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS7888EVM Overview

Product belongs to the microPOWER series. This product is categorized as Evaluation Boards Type: ADC This product's 1.25M. Data-Interface: Serial 8 bits 1 units Input range: 0 ~ 5.25 V Included item: Board. IC package type: ADS7888 This product operates at a 2.35 V to 5.25 V supply voltage for reliable performance. This tool is designed for the ADS7888.

ADS7888EVM Image

ADS7888EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7888EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series microPOWER
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 1.25M
  • Data-Interface Serial
  • Number-of-Bits 8
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ 5.25 V
  • Supplied-Contents Board
  • Utilized-IC-Part ADS7888
  • Power-Typ-Conditions 3.8mW @ 3 V, 8mW @ 5 V
  • Operating-Supply-Voltage 2.35 V to 5.25 V
  • Tool-Is-For-Evaluation-Of ADS7888

ADS7888EVM

ADS7888EVM Specifications

ADS7888EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed microPOWER

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 1.25M.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is Serial.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 8.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 1

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 0 ~ 5.25 V.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS7888.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 2.35 V to 5.25 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS7888.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
56,74 $
56,74 $
10
53,91 $
539,08 $
100
51,07 $
5 107,05 $
500
48,23 $
24 116,65 $
1000
45,40 $
45 396,00 $
Top