ADS7871EVM

Mfr. #: ADS7871EVM
Өндіруші: Texas Instruments
Сипаттама: EVALUATION MODULE FOR ADS7871
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: ADS7871EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS7871EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC Bulk is the packaging method for this product This product's 48k. Data-Interface: SPI, DSP 14 bits 1 units Input range: 0 ~ 5 V Included item: Board. IC package type: ADS7871 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS7871.

ADS7871EVM Image

ADS7871EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7871EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Packaging Bulk
  • Sampling-Rate-Per-Second 48k
  • Data-Interface SPI, DSP
  • Number-of-Bits 14
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ 5 V
  • Supplied-Contents Board
  • Utilized-IC-Part ADS7871
  • Power-Typ-Conditions 8.5mW @ 48kSPS
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS7871

ADS7871EVM

ADS7871EVM Specifications

ADS7871EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 48k.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is SPI, DSP.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 14

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 1.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 0 ~ 5 V.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS7871.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V to 5 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS7871.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
9,42 $
9,42 $
10
8,95 $
89,49 $
100
8,48 $
847,80 $
500
8,01 $
4 003,50 $
1000
7,54 $
7 536,00 $
Top