ADS7826EVM

Mfr. #: ADS7826EVM
Өндіруші: Texas Instruments
Сипаттама: EVALUATION MODULE FOR ADS7826
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: ADS7826EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS7826EVM Overview

Product belongs to the microPOWER series. This product's 200k. Data-Interface: SPI 10 bits 1 units Input range: 0 ~ VREF Included item: Board. IC package type: ADS7826

ADS7826EVM Image

ADS7826EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7826EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series microPOWER
  • Sampling-Rate-Per-Second 200k
  • Data-Interface SPI
  • Number-of-Bits 10
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ VREF
  • Supplied-Contents Board
  • Utilized-IC-Part ADS7826
  • Power-Typ-Conditions -

ADS7826EVM

ADS7826EVM Specifications

ADS7826EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is microPOWER.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 200k

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is SPI.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 10.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 1.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 0 ~ VREF.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS7826.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
0,00 $
0,00 $
10
0,00 $
0,00 $
100
0,00 $
0,00 $
500
0,00 $
0,00 $
1000
0,00 $
0,00 $
Top