ADS62P22EVM

Mfr. #: ADS62P22EVM
Өндіруші: Texas Instruments
Сипаттама: ADS62P22EVM
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: ADS62P22EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS62P22EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 65M. Data-Interface: Serial, Parallel 12 bits 1 units Input range: 2 Vpp Included item: Board. IC package type: ADS62P22 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS62P22. SMA SPI interface type

ADS62P22EVM Image

ADS62P22EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS62P22EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 65M
  • Data-Interface Serial, Parallel
  • Number-of-Bits 12
  • Number-of-A-D-Converters 1
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS62P22
  • Power-Typ-Conditions 515mW @ 65MSPS
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS62P22
  • Interface-Type SMA SPI

ADS62P22EVM

ADS62P22EVM Specifications

ADS62P22EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 65M

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed Serial, Parallel

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 12

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 1.

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 2 Vpp

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS62P22.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V to 5 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS62P22.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SMA SPI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
346,20 $
346,20 $
10
328,89 $
3 288,90 $
100
311,58 $
31 158,00 $
500
294,27 $
147 135,00 $
1000
276,96 $
276 960,00 $
Top