ADS5481EVM

Mfr. #: ADS5481EVM
Өндіруші: Texas Instruments
Сипаттама: EVALUATON MODULE FOR ADS5481
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: ADS5481EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5481EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 80M. Data-Interface: Parallel 16 bits 1 units Input range: 3 Vpp Included item: Board. IC package type: ADS5481 This product operates at a 6 V to 36 V supply voltage for reliable performance. This tool is designed for the ADS5481. SMA interface type

ADS5481EVM Image

ADS5481EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5481EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 80M
  • Data-Interface Parallel
  • Number-of-Bits 16
  • Number-of-A-D-Converters 1
  • Input-Range 3 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS5481
  • Power-Typ-Conditions 2.15W @ 80MSPS
  • Operating-Supply-Voltage 6 V to 36 V
  • Tool-Is-For-Evaluation-Of ADS5481
  • Interface-Type SMA

ADS5481EVM

ADS5481EVM Specifications

ADS5481EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 80M

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed Parallel

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 16

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 1

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 3 Vpp.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS5481.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 6 V to 36 V

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS5481.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
346,23 $
346,23 $
10
328,92 $
3 289,18 $
100
311,61 $
31 160,70 $
500
294,30 $
147 147,75 $
1000
276,98 $
276 984,00 $
Top