ADS5282EVM

Mfr. #: ADS5282EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL MODULE FOR ADS5282
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: ADS5282EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5282EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 65M. Data-Interface: Serial 12 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADS5282 This product operates at a 1.8 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS5282. SMA interface type

ADS5282EVM Image

ADS5282EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5282EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 65M
  • Data-Interface Serial
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS5282
  • Power-Typ-Conditions 77mW @ 65MSPS
  • Operating-Supply-Voltage 1.8 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS5282
  • Interface-Type SMA

ADS5282EVM

ADS5282EVM Specifications

ADS5282EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 65M.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is Serial.

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 12.

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 2.

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 2 Vpp

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS5282.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 1.8 V to 5 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS5282.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed SMA

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
448,50 $
448,50 $
10
426,08 $
4 260,75 $
100
403,65 $
40 365,00 $
500
381,22 $
190 612,50 $
1000
358,80 $
358 800,00 $
Top