ADS4122EVM

Mfr. #: ADS4122EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL MODULE FOR ADS4122
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: ADS4122EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS4122EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 65M. Data-Interface: CMOS, LVDS, Serial, Parallel 12 bits 1 units Input range: 2 Vpp Included item: Board. IC package type: ADS4122 This tool is designed for the ADS4122. SPI interface type

ADS4122EVM Image

ADS4122EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS4122EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 65M
  • Data-Interface CMOS, LVDS, Serial, Parallel
  • Number-of-Bits 12
  • Number-of-A-D-Converters 1
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS4122
  • Power-Typ-Conditions -
  • Tool-Is-For-Evaluation-Of ADS4122
  • Interface-Type SPI

ADS4122EVM

ADS4122EVM Specifications

ADS4122EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 65M

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed CMOS, LVDS, Serial, Parallel

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 12.

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 1.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 2 Vpp.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS4122

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS4122.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed SPI

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
346,20 $
346,20 $
10
328,89 $
3 288,90 $
100
311,58 $
31 158,00 $
500
294,27 $
147 135,00 $
1000
276,96 $
276 960,00 $
Top