| Mfr. #: | ADC3443EVM |
|---|---|
| Өндіруші: | Texas Instruments |
| Сипаттама: | EVAL MODULE ADC3443 |
| Өміршеңдік кезең: | Осы өндірушіден жаңа. |
| Деректер тізімі: | ADC3443EVM Деректер тізімі |


Product belongs to the - series. Bulk is the packaging method for this product This product's 80M. Data-Interface: LVDS - Serial 14 bits 4 units Input range: 2 Vpp Included item: Board. IC package type: ADC3443

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC3443EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: Is the cutoff frequency of the product Packaging?
Q: Yes, the product's Packaging is indeed Bulk
A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?
Q: Yes, the product's Sampling-Rate-Per-Second is indeed 80M
A: Is the cutoff frequency of the product Data-Interface?
Q: Yes, the product's Data-Interface is indeed LVDS - Serial
A: Is the cutoff frequency of the product Number-of-Bits?
Q: Yes, the product's Number-of-Bits is indeed 14
A: At what frequency does the Number-of-A-D-Converters?
Q: The product Number-of-A-D-Converters is 4.
A: What is the Input-Range of the product?
Q: The Input-Range of the product is 2 Vpp.
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is Board.
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is ADC3443.