ADC3442EVM

Mfr. #: ADC3442EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL MODULE ADC3442
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: ADC3442EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADC3442EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: ADC Bulk is the packaging method for this product This product's 50M. Data-Interface: LVDS - Serial 14 bits 4 units Input range: 2 Vpp Included item: Board. IC package type: ADC3442 This product operates at a 1.8 V supply voltage for reliable performance. This product is an ADC3442 evaluation module. This tool is designed for the ADC3442. Serial LVDS interface type

ADC3442EVM Image

ADC3442EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC3442EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Modules
  • Type ADC
  • Packaging Bulk
  • Sampling-Rate-Per-Second 50M
  • Data-Interface LVDS - Serial
  • Number-of-Bits 14
  • Number-of-A-D-Converters 4
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADC3442
  • Power-Typ-Conditions 228mW @ 50MSPS
  • Operating-Supply-Voltage 1.8 V
  • Description-Function ADC3442 evaluation module
  • Tool-Is-For-Evaluation-Of ADC3442
  • Interface-Type Serial LVDS

ADC3442EVM

ADC3442EVM Specifications

ADC3442EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 50M.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is LVDS - Serial.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 14

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 4.

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 2 Vpp

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADC3442.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 1.8 V

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is ADC3442 evaluation module.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADC3442

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is Serial LVDS.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
57,20 $
57,20 $
10
54,34 $
543,35 $
100
51,48 $
5 147,55 $
500
48,62 $
24 307,90 $
1000
45,76 $
45 756,00 $
Top