VCA5807EVM

Mfr. #: VCA5807EVM
Өндіруші: Texas Instruments
Сипаттама: Amplifier IC Development Tools VCA5807 EVAL MOD
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: VCA5807EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
VCA5807EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Instrumentation Amplifiers type. Texas Instruments is a trusted brand for quality electronics Interface Type: USB Compatible with VCA5807. Amplifier IC Development Tools product type 1 of 100 Development Tools as subcategory

VCA5807EVM Image

VCA5807EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

VCA5807EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Amplifier IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Instrumentation Amplifiers
  • Tool Is For Evaluation Of: VCA5807
  • Series: VCA5807
  • Brand: Texas Instruments
  • Interface Type: USB
  • For Use With: VCA5807
  • Product Type: Amplifier IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

VCA5807EVM

VCA5807EVM Specifications

VCA5807EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Instrumentation Amplifiers.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is USB.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is VCA5807.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Amplifier IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top