TX517EVM

Mfr. #: TX517EVM
Өндіруші: Texas Instruments
Сипаттама: Other Development Tools TX517 EVAL MOD
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TX517EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TX517EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Level Translator type. Texas Instruments is a trusted brand for quality electronics Interface Type: USB 1.2 V, 3.3 V, 5 V operating supply voltage range Other Development Tools product type 1 of 100 Development Tools as subcategory

TX517EVM Image

TX517EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TX517EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Other Development Tools
  • RoHS: E
  • Product: Evaluation Modules
  • Type: Voltage Level Translator
  • Tool Is For Evaluation Of: TX517
  • Series: TX517
  • Brand: Texas Instruments
  • Interface Type: USB
  • Operating Supply Voltage: 1.2 V, 3.3 V, 5 V
  • Product Type: Other Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TX517EVM

TX517EVM Specifications

TX517EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Voltage Level Translator

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is USB.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 1.2 V, 3.3 V, 5 V.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Other Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top