TVP9900EVM

Mfr. #: TVP9900EVM
Өндіруші: Texas Instruments
Сипаттама: Video IC Development Tools TVP9900 Eval Mod
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TVP9900EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TVP9900EVM Overview

This product is manufactured by Texas Instruments. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: I2C Video IC Development Tools product type 1 of 100 Development Tools as subcategory

TVP9900EVM Image

TVP9900EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TVP9900EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Video IC Development Tools
  • RoHS: N
  • Tool Is For Evaluation Of: TVP9900
  • Operating Supply Voltage: 5 V
  • Brand: Texas Instruments
  • Interface Type: I2C
  • Product Type: Video IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TVP9900EVM

TVP9900EVM Specifications

TVP9900EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 5 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is I2C.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Video IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top