TSW4100EVM

Mfr. #: TSW4100EVM
Өндіруші: Texas Instruments
Сипаттама: RF Development Tools TSW4100 Eval Mod
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TSW4100EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSW4100EVM Overview

This product is manufactured by Texas Instruments. Demonstration Kits This device belongs to the RF Transceivers type. Frequency range: 80 MHz to 240 MHz 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics RF Development Tools product type 1 of 100 Development Tools as subcategory

TSW4100EVM Image

TSW4100EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSW4100EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: RF Development Tools
  • RoHS: N
  • Product: Demonstration Kits
  • Type: RF Transceivers
  • Tool Is For Evaluation Of: GC5016, TRF3761
  • Frequency: 80 MHz to 240 MHz
  • Operating Supply Voltage: 5 V
  • Description/Function: TSW4100 Wideband Digital Repeater Demonstration Kit
  • Brand: Texas Instruments
  • Product Type: RF Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TSW4100EVM

TSW4100EVM Specifications

TSW4100EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Demonstration Kits

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed RF Transceivers

  • A: Is the cutoff frequency of the product Frequency?

    Q: Yes, the product's Frequency is indeed 80 MHz to 240 MHz

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 5 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Product Type?

    Q: The product Product Type is RF Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top