TSC2100EVM

Mfr. #: TSC2100EVM
Өндіруші: Texas Instruments
Сипаттама: Touch Sensor Development Tools TSC2100 Eval Mod
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TSC2100EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSC2100EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Resistive Touch Sensor type. 2.7 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Touch Sensor Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.390825 oz of Unit Weight

TSC2100EVM Image

TSC2100EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2100EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Touch Sensor Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Resistive Touch Sensor
  • Tool Is For Evaluation Of: TSC2100
  • Operating Supply Voltage: 2.7 V
  • Series: TSC2100
  • Brand: Texas Instruments
  • Product Type: Touch Sensor Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.390825 oz

TSC2100EVM

TSC2100EVM Specifications

TSC2100EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Resistive Touch Sensor.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 2.7 V

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Touch Sensor Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 0.390825 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top