TRF37B75EVM

Mfr. #: TRF37B75EVM
Өндіруші: Texas Instruments
Сипаттама: RF Development Tools Evaluation Module
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TRF37B75EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF37B75EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the RF Amplifiers type. Frequency range: 40 MHz to 4 GHz 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics RF Development Tools product type 1 of 100 Development Tools as subcategory

TRF37B75EVM Image

TRF37B75EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF37B75EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: RF Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: RF Amplifiers
  • Tool Is For Evaluation Of: TRF37B75
  • Frequency: 40 MHz to 4 GHz
  • Operating Supply Voltage: 5 V
  • Description/Function: TRF37B75 evaluation module
  • Series: TRF37B75
  • Brand: Texas Instruments
  • Product Type: RF Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TRF37B75EVM

TRF37B75EVM Specifications

TRF37B75EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed RF Amplifiers

  • A: Is the cutoff frequency of the product Frequency?

    Q: Yes, the product's Frequency is indeed 40 MHz to 4 GHz

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 5 V

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is RF Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top