TPSM84A22EVM-809

Mfr. #: TPSM84A22EVM-809
Өндіруші: Texas Instruments
Сипаттама: Power Management IC Development Tools TPSM84A22 EVM
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TPSM84A22EVM-809 Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPSM84A22EVM-809 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 8 V to 14 V Input Voltage Output Voltage is 1.2 V to 2.05 V Output current: 10 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory The product's SWIFT is Blue Gecko. 1. 0.022187 oz of Unit Weight

TPSM84A22EVM-809 Image

TPSM84A22EVM-809

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPSM84A22EVM-809 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPSM84A22
  • Input Voltage: 8 V to 14 V
  • Output Voltage: 1.2 V to 2.05 V
  • Output Current: 10 A
  • Series: TPSM84A21/22
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: SWIFT
  • Unit Weight: 0.022187 oz

TPSM84A22EVM-809

TPSM84A22EVM-809 Specifications

TPSM84A22EVM-809 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Voltage Regulators - Switching Regulators

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 8 V to 14 V

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 1.2 V to 2.05 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 10 A.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: Is the cutoff frequency of the product Tradename?

    Q: Yes, the product's Tradename is indeed SWIFT

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.022187 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top