TPSM846C24EVM-006

Mfr. #: TPSM846C24EVM-006
Өндіруші: Texas Instruments
Сипаттама: Power Management IC Development Tools TPSM846C24EVM
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TPSM846C24EVM-006 Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPSM846C24EVM-006 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 4.5 V to 15 V Input Voltage Output Voltage is 0.5 V to 2 V Output current: 35 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.885634 oz of Unit Weight

TPSM846C24EVM-006 Image

TPSM846C24EVM-006

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPSM846C24EVM-006 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPSM846C24
  • Input Voltage: 4.5 V to 15 V
  • Output Voltage: 0.5 V to 2 V
  • Output Current: 35 A
  • Series: TPSM846C24
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.885634 oz

TPSM846C24EVM-006

TPSM846C24EVM-006 Specifications

TPSM846C24EVM-006 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Voltage Regulators - Switching Regulators.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 4.5 V to 15 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 0.5 V to 2 V.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 35 A

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.885634 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top