TPS99110EVM

Mfr. #: TPS99110EVM
Өндіруші: Texas Instruments
Сипаттама: Interface Development Tools TPS99110-Q1 Eval Module
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TPS99110EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS99110EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the CAN, LIN type. Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Interface Type: CAN, LIN 14 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory

TPS99110EVM Image

TPS99110EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS99110EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: CAN, LIN
  • Tool Is For Evaluation Of: TPS99110-Q1
  • Packaging: Bulk
  • Description/Function: Evaluation module for TPS99110-Q1 system basis chip for automotive transmission electrical control units
  • Brand: Texas Instruments
  • Interface Type: CAN, LIN
  • Operating Supply Voltage: 14 V
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS99110EVM

TPS99110EVM Specifications

TPS99110EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed CAN, LIN

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is CAN, LIN.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 14 V.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Interface Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top