TPS7B6950EVM

Mfr. #: TPS7B6950EVM
Өндіруші: Texas Instruments
Сипаттама: Power Management IC Development Tools TPS7B6950EVM
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TPS7B6950EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS7B6950EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Linear Voltage Regulators type. 5.5 V to 40 V Input Voltage Bulk packaging for easy dispensing Output current: 150 mA Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS7B6950EVM Image

TPS7B6950EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS7B6950EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Linear Voltage Regulators
  • Tool Is For Evaluation Of: TPS7B6950
  • Input Voltage: 5.5 V to 40 V
  • Packaging: Bulk
  • Description/Function: TPS7B6950QDCYRQ1 low quiescent low dropout evaluation module
  • Output Current: 150 mA
  • Series: TPS7B69
  • Brand: Texas Instruments
  • Maximum Operating Temperature: + 125 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS7B6950EVM

TPS7B6950EVM Specifications

TPS7B6950EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Linear Voltage Regulators.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 5.5 V to 40 V.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 150 mA.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Maximum Operating Temperature?

    Q: Yes, the product's Maximum Operating Temperature is indeed + 125 C

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top