TPS7A4525EVM-385

Mfr. #: TPS7A4525EVM-385
Өндіруші: Texas Instruments
Сипаттама: Power Management IC Development Tools TPS7A4525EVM385 Eval Mod
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TPS7A4525EVM-385 Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS7A4525EVM-385 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the LDO Voltage Regulators type. 20 V Input Voltage Output Voltage is 6 V Dimensions of 63.5 mm x 63.5 mm Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS7A4525EVM-385 Image

TPS7A4525EVM-385

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS7A4525EVM-385 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: LDO Voltage Regulators
  • Tool Is For Evaluation Of: TPS7A4525
  • Input Voltage: 20 V
  • Output Voltage: 6 V
  • Dimensions: 63.5 mm x 63.5 mm
  • Series: TPS7A45
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS7A4525EVM-385

TPS7A4525EVM-385 Specifications

TPS7A4525EVM-385 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is LDO Voltage Regulators.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 20 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 6 V

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 63.5 mm x 63.5 mm.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top