TPS78633EVM-207

Mfr. #: TPS78633EVM-207
Өндіруші: Texas Instruments
Сипаттама: Power Management IC Development Tools TPS78633-207 Eval Mod
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TPS78633EVM-207 Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS78633EVM-207 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the LDO Voltage Regulators type. 2.7 V to 5.5 V Input Voltage Output Voltage is 3.3 V Dimensions of 52.2 mm x 47 mm Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS78633EVM-207 Image

TPS78633EVM-207

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS78633EVM-207 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: LDO Voltage Regulators
  • Tool Is For Evaluation Of: TPS78633
  • Input Voltage: 2.7 V to 5.5 V
  • Output Voltage: 3.3 V
  • Dimensions: 52.2 mm x 47 mm
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS78633EVM-207

TPS78633EVM-207 Specifications

TPS78633EVM-207 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed LDO Voltage Regulators

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 2.7 V to 5.5 V

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 3.3 V.

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed 52.2 mm x 47 mm

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top