TPS659101EVM-583

Mfr. #: TPS659101EVM-583
Өндіруші: Texas Instruments
Сипаттама: Power Management IC Development Tools TPS659101 Eval Mod
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TPS659101EVM-583 Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS659101EVM-583 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the PMIC Solutions type. 5 V Input Voltage Output Voltage is 0.6 V to 5 V Dimensions of 101.6 mm x 101.6 mm Output current: 50 mA to 1.5 A Texas Instruments is a trusted brand for quality electronics Interface Type: I2C Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS659101EVM-583 Image

TPS659101EVM-583

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS659101EVM-583 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: E
  • Product: Evaluation Modules
  • Type: PMIC Solutions
  • Tool Is For Evaluation Of: TPS65910
  • Input Voltage: 5 V
  • Output Voltage: 0.6 V to 5 V
  • Description/Function: Evaluation Module for TPS659101 Integrated Power Management IC w/ 4 DC/DCs, 8 LDOs
  • Dimensions: 101.6 mm x 101.6 mm
  • Output Current: 50 mA to 1.5 A
  • Series: TPS659101
  • Brand: Texas Instruments
  • Interface Type: I2C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS659101EVM-583

TPS659101EVM-583 Specifications

TPS659101EVM-583 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed PMIC Solutions

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 5 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 0.6 V to 5 V.

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed 101.6 mm x 101.6 mm

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 50 mA to 1.5 A.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is I2C.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top