| Mfr. #: | TPS62823EVM-005 |
|---|---|
| Өндіруші: | Texas Instruments |
| Сипаттама: | Power Management IC Development Tools TPS62823EVM-005 |
| Өміршеңдік кезең: | Осы өндірушіден жаңа. |
| Деректер тізімі: | TPS62823EVM-005 Деректер тізімі |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 2.4 V to 5.5 V Input Voltage Output Voltage is 1.8 V Output current: 3 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.049190 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS62823EVM-005 Specifications
A: Is the cutoff frequency of the product Manufacturer?
Q: Yes, the product's Manufacturer is indeed Texas Instruments
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is Voltage Regulators - Switching Regulators.
A: What is the Input Voltage of the product?
Q: The Input Voltage of the product is 2.4 V to 5.5 V.
A: What is the Output Voltage of the product?
Q: The Output Voltage of the product is 1.8 V.
A: At what frequency does the Output Current?
Q: The product Output Current is 3 A.
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.
A: At what frequency does the Unit Weight?
Q: The product Unit Weight is 0.049190 oz.