| Mfr. #: | TPS62684EVM-647 |
|---|---|
| Өндіруші: | Texas Instruments |
| Сипаттама: | Power Management IC Development Tools Evaluation Module |
| Өміршеңдік кезең: | Осы өндірушіден жаңа. |
| Деректер тізімі: | TPS62684EVM-647 Деректер тізімі |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 3.25 V to 5.5 V Input Voltage Output Voltage is 2.85 V Bulk packaging for easy dispensing Output current: 1.6 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS62684EVM-647 Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Voltage Regulators - Switching Regulators
A: Is the cutoff frequency of the product Input Voltage?
Q: Yes, the product's Input Voltage is indeed 3.25 V to 5.5 V
A: At what frequency does the Output Voltage?
Q: The product Output Voltage is 2.85 V.
A: At what frequency does the Packaging?
Q: The product Packaging is Bulk.
A: At what frequency does the Output Current?
Q: The product Output Current is 1.6 A.
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: What is the Product Type of the product?
Q: The Product Type of the product is Power Management IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.