TPS62360EVM-655

Mfr. #: TPS62360EVM-655
Өндіруші: Texas Instruments
Сипаттама: Power Management IC Development Tools TPS62360EVM-655
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TPS62360EVM-655 Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS62360EVM-655 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the PMIC Solutions type. Output Voltage is 1.4 V Texas Instruments is a trusted brand for quality electronics Interface Type: I2C Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.158458 oz of Unit Weight

TPS62360EVM-655 Image

TPS62360EVM-655

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS62360EVM-655 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: E
  • Product: Evaluation Boards
  • Type: PMIC Solutions
  • Tool Is For Evaluation Of: TPS6236x
  • Output Voltage: 1.4 V
  • Series: TPS62360
  • Brand: Texas Instruments
  • Interface Type: I2C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.158458 oz

TPS62360EVM-655

TPS62360EVM-655 Specifications

TPS62360EVM-655 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed PMIC Solutions

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 1.4 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is I2C.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.158458 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top