TPS62240EVM-229

Mfr. #: TPS62240EVM-229
Өндіруші: Texas Instruments
Сипаттама: Power Management IC Development Tools TPS62240EVM-229
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TPS62240EVM-229 Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS62240EVM-229 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Voltage Regulators - Switching Regulators type. 3 V Input Voltage Output Voltage is 1.8 V Dimensions of 53.3 mm x 35.6 mm Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS62240EVM-229 Image

TPS62240EVM-229

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS62240EVM-229 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: E
  • Product: Evaluation Boards
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS62240
  • Input Voltage: 3 V
  • Output Voltage: 1.8 V
  • Dimensions: 53.3 mm x 35.6 mm
  • Series: TPS62240
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS62240EVM-229

TPS62240EVM-229 Specifications

TPS62240EVM-229 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Voltage Regulators - Switching Regulators.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 3 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 1.8 V.

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 53.3 mm x 35.6 mm.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top