TPS61158EVM-565

Mfr. #: TPS61158EVM-565
Өндіруші: Texas Instruments
Сипаттама: LED Lighting Development Tools TPS61158 EVAL MOD
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TPS61158EVM-565 Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS61158EVM-565 Overview

This product is manufactured by Texas Instruments. Evaluation Modules Texas Instruments is a trusted brand for quality electronics LED Lighting Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.052241 oz of Unit Weight

TPS61158EVM-565 Image

TPS61158EVM-565

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS61158EVM-565 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: LED Lighting Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Series: TPS61158
  • Brand: Texas Instruments
  • Product Type: LED Lighting Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.052241 oz

TPS61158EVM-565

TPS61158EVM-565 Specifications

TPS61158EVM-565 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is LED Lighting Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.052241 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top