TPS60100EVM-131

Mfr. #: TPS60100EVM-131
Өндіруші: Texas Instruments
Сипаттама: Power Management IC Development Tools 2 batt cells
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TPS60100EVM-131 Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS60100EVM-131 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Voltage Regulators - Switching Regulators type. 1.8 V to 3.6 V Input Voltage Output Voltage is 3.3 V Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS60100EVM-131 Image

TPS60100EVM-131

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS60100EVM-131 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS60100
  • Input Voltage: 1.8 V to 3.6 V
  • Output Voltage: 3.3 V
  • Packaging: Bulk
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS60100EVM-131

TPS60100EVM-131 Specifications

TPS60100EVM-131 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is Voltage Regulators - Switching Regulators.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 1.8 V to 3.6 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 3.3 V.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top