| Mfr. #: | TPS56C215EVM-762 |
|---|---|
| Өндіруші: | Texas Instruments |
| Сипаттама: | Power Management IC Development Tools TPS56C215EVM-762 |
| Өміршеңдік кезең: | Осы өндірушіден жаңа. |
| Деректер тізімі: | TPS56C215EVM-762 Деректер тізімі |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Linear Voltage Regulators type. 4.5 V to 17 V Input Voltage Output Voltage is 1.2 V Output current: 0 A to 12 A Texas Instruments is a trusted brand for quality electronics Compatible with TPS56C215. The product can operate at a maximum temperature of + 150 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory The product's SWIFT is Blue Gecko.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS56C215EVM-762 Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: What is the Type of the product?
Q: The Type of the product is Linear Voltage Regulators.
A: Is the cutoff frequency of the product Input Voltage?
Q: Yes, the product's Input Voltage is indeed 4.5 V to 17 V
A: What is the Output Voltage of the product?
Q: The Output Voltage of the product is 1.2 V.
A: Is the cutoff frequency of the product Output Current?
Q: Yes, the product's Output Current is indeed 0 A to 12 A
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: What is the For Use With of the product?
Q: The For Use With of the product is TPS56C215.
A: Is the cutoff frequency of the product Maximum Operating Temperature?
Q: Yes, the product's Maximum Operating Temperature is indeed + 150 C
A: What is the Minimum Operating Temperature of the product?
Q: The Minimum Operating Temperature of the product is - 40 C.
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.
A: Is the cutoff frequency of the product Tradename?
Q: Yes, the product's Tradename is indeed SWIFT