TPS5432EVM-116

Mfr. #: TPS5432EVM-116
Өндіруші: Texas Instruments
Сипаттама: Power Management IC Development Tools TPS5432EVM-116
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TPS5432EVM-116 Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS5432EVM-116 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 2.95 V to 6 V Input Voltage Output Voltage is 1.8 V Output current: 3 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory The product's SWIFT is Blue Gecko.

TPS5432EVM-116 Image

TPS5432EVM-116

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS5432EVM-116 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS5432
  • Input Voltage: 2.95 V to 6 V
  • Output Voltage: 1.8 V
  • Output Current: 3 A
  • Series: TPS5432
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: SWIFT

TPS5432EVM-116

TPS5432EVM-116 Specifications

TPS5432EVM-116 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Voltage Regulators - Switching Regulators

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 2.95 V to 6 V

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 1.8 V.

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 3 A.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: Is the cutoff frequency of the product Tradename?

    Q: Yes, the product's Tradename is indeed SWIFT

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top