Product Details
TPS40425EVM-594 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 7 V to 14 V Input Voltage Output Voltage is 1.2 V, 1.8 V Output current: 20 A Texas Instruments is a trusted brand for quality electronics Interface Type: PMBus Compatible with TPS40425. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.268072 oz of Unit Weight

TPS40425EVM-594 Image

TPS40425EVM-594

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS40425EVM-594 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS40425
  • Input Voltage: 7 V to 14 V
  • Output Voltage: 1.2 V, 1.8 V
  • Description/Function: TPS40425 evaluation module dual output with PMBus interface
  • Output Current: 20 A
  • Series: TPS40425
  • Brand: Texas Instruments
  • Interface Type: PMBus
  • For Use With: TPS40425
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.268072 oz

TPS40425EVM-594

TPS40425EVM-594 Specifications

TPS40425EVM-594 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Voltage Regulators - Switching Regulators.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 7 V to 14 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 1.2 V, 1.8 V.

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 20 A.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed PMBus

  • A: At what frequency does the For Use With?

    Q: The product For Use With is TPS40425.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.268072 oz.