TPS3851EVM-780

Mfr. #: TPS3851EVM-780
Өндіруші: Texas Instruments
Сипаттама: Power Management IC Development Tools Evaluation Module
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TPS3851EVM-780 Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS3851EVM-780 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Supervisory Circuits type. 1.6 V to 6.5 V Input Voltage Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS3851EVM-780 Image

TPS3851EVM-780

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS3851EVM-780 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Supervisory Circuits
  • Tool Is For Evaluation Of: TPS3851
  • Input Voltage: 1.6 V to 6.5 V
  • Description/Function: Evaluation module for TPS3851 voltage supervisor
  • Series: TPS3851
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS3851EVM-780

TPS3851EVM-780 Specifications

TPS3851EVM-780 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Supervisory Circuits

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 1.6 V to 6.5 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top