TPS25741EVM-802

Mfr. #: TPS25741EVM-802
Өндіруші: Texas Instruments
Сипаттама: Interface Development Tools TPS25741EVM-802 EVM
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TPS25741EVM-802 Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS25741EVM-802 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the USB type. Texas Instruments is a trusted brand for quality electronics 22 V to 28 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.102851 oz of Unit Weight

TPS25741EVM-802 Image

TPS25741EVM-802

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS25741EVM-802 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: USB
  • Tool Is For Evaluation Of: TPS25741
  • Series: TPS25741
  • Brand: Texas Instruments
  • Operating Supply Voltage: 22 V to 28 V
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.102851 oz

TPS25741EVM-802

TPS25741EVM-802 Specifications

TPS25741EVM-802 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed USB

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 22 V to 28 V

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Interface Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.102851 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top