| Mfr. #: | TPS2544EVM-064 |
|---|---|
| Өндіруші: | Texas Instruments |
| Сипаттама: | Power Management IC Development Tools TPS2544 EVAL MOD |
| Өміршеңдік кезең: | Осы өндірушіден жаңа. |
| Деректер тізімі: | TPS2544EVM-064 Деректер тізімі |


This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Load Switches type. Texas Instruments is a trusted brand for quality electronics Compatible with TPS2544. The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2544EVM-064 Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Boards.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Load Switches
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: What is the For Use With of the product?
Q: The For Use With of the product is TPS2544.
A: What is the Maximum Operating Temperature of the product?
Q: The Maximum Operating Temperature of the product is + 125 C.
A: Is the cutoff frequency of the product Minimum Operating Temperature?
Q: Yes, the product's Minimum Operating Temperature is indeed - 40 C
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Power Management IC Development Tools
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: At what frequency does the Subcategory?