TPS22976EVM

Mfr. #: TPS22976EVM
Өндіруші: Texas Instruments
Сипаттама: Power Management IC Development Tools EVALUATION MODULE FOR THE TPS22976
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TPS22976EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS22976EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Power Distributions type. 600 mV to 5.7 V Input Voltage Output current: 6 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS22976EVM Image

TPS22976EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS22976EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Power Distributions
  • Tool Is For Evaluation Of: TPS22976
  • Input Voltage: 600 mV to 5.7 V
  • Description/Function: Evaluation module for TPS22976 load switch
  • Output Current: 6 A
  • Series: TPS22976
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS22976EVM

TPS22976EVM Specifications

TPS22976EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Power Distributions.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 600 mV to 5.7 V.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 6 A

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top