TPS22958EVM

Mfr. #: TPS22958EVM
Өндіруші: Texas Instruments
Сипаттама: Power Management IC Development Tools TPS22958EVM
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TPS22958EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS22958EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Load Switches type. 600 mV to 5.5 V Input Voltage Output Voltage is 5.5 V Bulk packaging for easy dispensing Output current: 4 A/6 A Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 105 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.046056 oz of Unit Weight

TPS22958EVM Image

TPS22958EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS22958EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Load Switches
  • Tool Is For Evaluation Of: TPS22958
  • Input Voltage: 600 mV to 5.5 V
  • Output Voltage: 5.5 V
  • Packaging: Bulk
  • Output Current: 4 A/6 A
  • Series: TPS22958
  • Brand: Texas Instruments
  • Maximum Operating Temperature: + 105 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.046056 oz

TPS22958EVM

TPS22958EVM Specifications

TPS22958EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Load Switches.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 600 mV to 5.5 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 5.5 V.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 4 A/6 A.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Maximum Operating Temperature?

    Q: Yes, the product's Maximum Operating Temperature is indeed + 105 C

  • A: At what frequency does the Minimum Operating Temperature?

    Q: The product Minimum Operating Temperature is - 40 C.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 0.046056 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top