| Mfr. #: | TPS2066EVM-293 |
|---|---|
| Өндіруші: | Texas Instruments |
| Сипаттама: | Switch IC Development Tools TPS2066EVM-293 Eval Mod |
| Өміршеңдік кезең: | Осы өндірушіден жаңа. |
| Деректер тізімі: | TPS2066EVM-293 Деректер тізімі |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the USB Switches type. Texas Instruments is a trusted brand for quality electronics 2.7 V to 5.5 V operating supply voltage range Switch IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.162030 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2066EVM-293 Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed USB Switches
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: At what frequency does the Operating Supply Voltage?
Q: The product Operating Supply Voltage is 2.7 V to 5.5 V.
A: What is the Product Type of the product?
Q: The Product Type of the product is Switch IC Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.
A: Is the cutoff frequency of the product Unit Weight?
Q: Yes, the product's Unit Weight is indeed 0.162030 oz