TPS2064EVM-296

Mfr. #: TPS2064EVM-296
Өндіруші: Texas Instruments
Сипаттама: Power Management IC Development Tools TPS2064EVM-296 Eval Mod
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TPS2064EVM-296 Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2064EVM-296 Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS2064EVM-296 Image

TPS2064EVM-296

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2064EVM-296 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Tool Is For Evaluation Of: TPS2064DGN
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS2064EVM-296

TPS2064EVM-296 Specifications

TPS2064EVM-296 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top