TPA2005D1EVM

Mfr. #: TPA2005D1EVM
Өндіруші: Texas Instruments
Сипаттама: Audio IC Development Tools TPA2005D1 Eval Mod
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TPA2005D1EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPA2005D1EVM Overview

This product is manufactured by Texas Instruments. This device belongs to the Audio Amplifier type. 5 V to 15 V operating supply voltage range Output power: 1.1 W Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.804096 oz of Unit Weight

TPA2005D1EVM Image

TPA2005D1EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA2005D1EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TPA2005D1
  • Operating Supply Voltage: 5 V to 15 V
  • Output Power: 1.1 W
  • Series: TPA2005D1
  • Brand: Texas Instruments
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.804096 oz

TPA2005D1EVM

TPA2005D1EVM Specifications

TPA2005D1EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Audio Amplifier

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 5 V to 15 V.

  • A: At what frequency does the Output Power?

    Q: The product Output Power is 1.1 W.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Audio IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.804096 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top