| Mfr. #: | TMP116EVM |
|---|---|
| Өндіруші: | Texas Instruments |
| Сипаттама: | Temperature Sensor Development Tools TMP116 EVALUATION BOARD |
| Өміршеңдік кезең: | Осы өндірушіден жаңа. |
| Деректер тізімі: | TMP116EVM Деректер тізімі |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Temperature Sensor type. 1.9 V to 5.5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is 0 C. Temperature Sensor Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP116EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is Temperature Sensor.
A: Is the cutoff frequency of the product Operating Supply Voltage?
Q: Yes, the product's Operating Supply Voltage is indeed 1.9 V to 5.5 V
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: What is the Interface Type of the product?
Q: The Interface Type of the product is I2C, USB.
A: At what frequency does the Maximum Operating Temperature?
Q: The product Maximum Operating Temperature is + 85 C.
A: What is the Minimum Operating Temperature of the product?
Q: The Minimum Operating Temperature of the product is 0 C.
A: At what frequency does the Product Type?
Q: The product Product Type is Temperature Sensor Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools