TLV2553EVM-PDK

Mfr. #: TLV2553EVM-PDK
Өндіруші: Texas Instruments
Сипаттама: Data Conversion IC Development Tools TLV2553EVM-PDK
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TLV2553EVM-PDK Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TLV2553EVM-PDK Overview

This product is manufactured by Texas Instruments. Demonstration Kits This device belongs to the ADC type. 3.3 V, 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: SPI, USB Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

TLV2553EVM-PDK Image

TLV2553EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TLV2553EVM-PDK Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: Y
  • Product: Demonstration Kits
  • Type: ADC
  • Tool Is For Evaluation Of: TLV2553
  • Operating Supply Voltage: 3.3 V, 5 V
  • Description/Function: Platform for evaluating the performance of the TLV2553 SAR ADC
  • Series: TLV2553
  • Brand: Texas Instruments
  • Interface Type: SPI, USB
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TLV2553EVM-PDK

TLV2553EVM-PDK Specifications

TLV2553EVM-PDK FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Demonstration Kits.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 3.3 V, 5 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed SPI, USB

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top