TL1963A-33EVM

Mfr. #: TL1963A-33EVM
Өндіруші: Texas Instruments
Сипаттама: Power Management IC Development Tools TL1963A-33EVM
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TL1963A-33EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TL1963A-33EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the LDO Voltage Regulators type. 20 V Input Voltage Dimensions of 63.5 mm x 63.5 mm Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TL1963A-33EVM Image

TL1963A-33EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TL1963A-33EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: LDO Voltage Regulators
  • Tool Is For Evaluation Of: TL1963A-33
  • Input Voltage: 20 V
  • Dimensions: 63.5 mm x 63.5 mm
  • Series: TL1963A
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TL1963A-33EVM

TL1963A-33EVM Specifications

TL1963A-33EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is LDO Voltage Regulators.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 20 V.

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed 63.5 mm x 63.5 mm

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top